2010 Bid Opening Results
Contract Description Bid Opening Date
Download file 10-26 Second Street & B Street Signal Replacement Project 12/16/2010
Download file 10-23 Bicycle Lanes Striping Project 2010 11/30/2010
Download file 10-20 Water Treatment Plant High Lift Pump Station Improvements 11/09/2010
Download file 11-05 (1) 300 hp motor and (1) Goulds vertical turbine pump, 6,250 gpm 10/26/2010
Download file 10-16 Wastewater Treatment Facility - Primary Clarifier # 2 Rehabilitation 09/01/2010
Download file 10-15 Fire Station No. 7 – Exterior Improvements 08/25/2010
Download file 10-17 Walton Water Transmission Line - Surface Restoration 08/24/2010
Download file 10-10 Striping & Pavement Marking Improvements 2010 08/03/2010
Download file 10-07 Willow Way Drainage Improvements 07/27/2010
Download file 10-03 Live Oak Blvd Sewer Repair Project 05/10/2010
Download file 10-06 Residential Resurfacing Project 2010 04/20/2010
Download file 09-32 WTP Filter Underdrain Repair 03/24/2010
Download file 09-28 CDBG Sidewalk Improvements FY 09/10 02/18/2010
Download file 08-22 Jamie Drive & Blevin Road Safe Routes to School Project 02/03/2010
Download file 09-10 Stimulus Street Rehabilitation – ARRA 2009 01/20/2010
Download file 09-30 Garden Highway Storage Tank Improvements 01/06/2010
Download file 09-29 Garden Highway Pump Station Improvements 01/06/2010


Previous Bid Opening Results.

For additional information, please contact the Engineering Department at:

(530) 822-4632 Phone
(530) 822-4694 Fax